We design, fabricate and install bow doors and ramps for landing craft and barges. Every door is modelled in 3D and drawn up before steel is cut, built in our workshop, blasted, coated and tested, then fitted on site with the hinges aligned, so it closes true and carries its load from the first trip.
The bow door as modelled, plated side up.Plating hidden: the framing grid behind it.From the workshop drawings: side view and sections, 1:25.
DESIGN, FABRICATION AND INSTALLATION
STAGE
WHAT WE DO
1Design
3D model and workshop drawings from the vessel's drawings or a survey of the old door: plate, framing, hinges and sections, so the client signs off before steel is cut.
2Fabrication
Built in our workshop. A large door is made in halves sized for road transport.
3Surface prep and coating
Abrasive blast and a marine coating system applied before delivery, to the specification for the vessel.
4Testing
Non-destructive testing of welds by an independent third party, to the percentage the job calls for.
5Installation
Old door removed, new door assembled on site, hinges aligned and centred, welded out, and the new welds blasted and painted.
6Records
Drawings, NDT results and a job report handed over with the door.
TECHNICAL SPECIFICATION: A 7.5 TONNE BOW DOOR
Door
Replacement bow door for a landing craft, built to the vessel's drawings
Weight
7.5 tonnes
Construction
Plated door on a grid of longitudinal and transverse frames, with a hinge tube along the top edge and a grated ramp section at the toe
Delivery
Built in two halves, transported to site in Darwin and welded together with the hinges centred
Surface preparation
Abrasive blast to Class 2.5, AS 1627.4
Coating
Interzone 954 at 500 microns DFT
NDT
10% of welds, by an independent third party
On site
Assembly, hinge alignment, weld-out, whip blast and paint of the new welds
Documentation
Workshop drawings and job report
Build time
6 to 8 weeks planned
WHAT TO SEND US FOR A QUOTE
The vessel's drawings for the door, or photos and measurements of the old one.
Class society, if the vessel is in class.
Where the vessel will be for the changeover, and when.
Any coating system or NDT the owner or class requires.