Offshore Fabrications
CORROSION PROTECTION

Denso work

Petrolatum tape systems for piles, pipework, buried lines and vessel fittings.

We protect steel from corrosion with Denso petrolatum tape systems: wharf and jetty piles, pipework and flanges, buried and submerged lines, and fittings on vessels and barges. The system goes on over hand-cleaned steel, tolerates damp surfaces and stays soft, so it seals out water and oxygen where coatings struggle.

A pipe wrapped in the Denso system, each layer cut back to show the one under it: steel, petrolatum paste, profiling mastic over a flange, petrolatum tape at 55 percent overlap, and an outer wrap.STEELCLEANED OF LOOSE RUST,SCALE, OIL AND DIRTPASTEPETROLATUM PRIMERWORKED INTO PITSMASTICPROFILING MASTICOVER FLANGES AND BOLTSTAPEPETROLATUM TAPE,55% OVERLAPOUTER WRAPPVC OR PE OVERWRAP,OR A PILE JACKET

WHERE WE APPLY IT

Piles and jetties
Wharf and jetty piles in the tidal and splash zone, wrapped and finished with a pile jacket.
Pipework and flanges
Pipes, flanges, valves and fittings, with profiling mastic over the awkward shapes.
Buried or submerged lines
Pipes and joints that go underground or underwater, with an outer wrap against backfill and abrasion.
Vessel and deck fittings
Bolts, bollards, deck penetrations and fittings on vessels and barges.

TECHNICAL SPECIFICATION: THE SYSTEM, LAYER BY LAYER

LAYERMATERIALWHAT IT DOES
1Surface preparationHand or power tool cleaningRemove loose rust, scale, old coating, oil, salt and dirt. Petrolatum systems tolerate a damp surface, so abrasive blasting is usually not needed.
2PrimerPetrolatum pasteWorked by hand into the cleaned surface, pits and crevices to displace moisture and seal the steel.
3ProfilingPetrolatum profiling masticBuilt up over flanges, bolt heads, valves and changes of shape, so the tape lies smooth with no voids.
4WrapPetrolatum tapeSpiral wrapped under tension with a 55% overlap, giving at least two layers everywhere, pressed down to remove air.
5Outer protectionPVC or PE overwrap, or a pile jacketProtects the tape from UV, abrasion and impact. On piles, an HDPE or GRP jacket is fitted over the wrap and banded.
6InspectionVisual checkEvery wrap is checked for full coverage, overlap, laps facing the right way and no wrinkles or voids, and recorded against your scope.

TECHNICAL SPECIFICATION: BY APPLICATION

APPLICATIONPREPARATIONBUILD-UPOUTER PROTECTION
Piles and jettiesWater jet or hand tool clean of marine growth and loose rustPaste and tape over the tidal and splash zoneHDPE or GRP pile jacket, banded; work timed to the tide
Pipework and flangesHand or power tool cleanPaste, profiling mastic over flanges and bolts, tape at 55% overlapPVC overwrap against UV and knocks
Buried or submerged linesHand or power tool clean of joints and damaged coatingPaste and tape, overlapping onto sound existing coatingPE or PVC overwrap against backfill and abrasion
Vessel and deck fittingsHand or power tool cleanPaste, mastic over bolt heads and penetrations, tapePVC overwrap; kept clear of moving parts and drains

BUILT FOR DARWIN CONDITIONS

  • Pile work is timed to the tide range of up to about 8 m, so the tidal and splash zone can be reached and wrapped.
  • Petrolatum goes on damp steel, which suits humid build-up and wet season work.
  • Every exposed wrap gets an outer layer against the Top End's UV.
  • Products and build-up are set for each job from the manufacturer's current data sheets.
01 ASSESS
02 PREPARE
03 PRIME
04 WRAP
05 PROTECT
06 INSPECT
Get a quote for your Denso work
Offshore Fabrications · Darwin, NT0472 921 798 · josiah@offshorefabrications.com.au
Diagram is illustrative and not to scale. Products, overlap and build-up are confirmed for each job from the manufacturer's data sheets. Denso is a trademark of its owner.